Spacecraft information: THOR III
| Launched | 9 June 1998 |
| Flight ended | – |
| Status | Non-operational |
| Launch site | Air Force Eastern Test Range, Florida, USA |
| Owner | Norway |
| NORAD ID | 25358 |
| COSPAR ID | 1998-035A |
| Observing |
Current orbital elements
| Inclination | 11.749° |
| Eccentricity | 0.00026 |
| RA ascending node | 2.616 hr |
| Argument perigee | 198.690° |
| Mean anomaly | 346.233° |
| Orbital period | 1457.020 min |
| Epoch of osculation | 21 May 2026, 11:31 |
Derived Quantities
| Min Altitude | 36191.1 km |
| Mean Altitude | 36202.3 km |
| Peak Altitude | 36213.4 km |
Orbital History
Drag the graphs below left or right to change the time range, or use your scroll wheel to zoom in or out.