Spacecraft information: IRNSS-1I
| Launched | 10 April 2018 |
| Flight ended | – |
| Status | Operational |
| Categories |
Geostationary
Active satellites |
| Launch site | Satish Dhawan Space Centre, India (Formerly Sriharikota Launching Range) |
| Owner | India |
| NORAD ID | 43286 |
| COSPAR ID | 2018-035A |
| Observing |
Current orbital elements
| Inclination | 29.105° |
| Eccentricity | 0.00178 |
| RA ascending node | 4.980 hr |
| Argument perigee | 183.825° |
| Mean anomaly | 353.569° |
| Orbital period | 1436.110 min |
| Epoch of osculation | 15 May 2026, 21:33 |
Derived Quantities
| Min Altitude | 35719.0 km |
| Mean Altitude | 35794.0 km |
| Peak Altitude | 35868.9 km |
Launched alongside
PSLV R/BOrbital History
Drag the graphs below left or right to change the time range, or use your scroll wheel to zoom in or out.